This topic applies only to the IBM Business Automation Workflow Advanced
configuration.

Detaching the integration test client from test configuration modules

Draft comment:
This topic only applies to BAW, and is located in the BAW repository. Last updated on 2025-03-13 12:15
If you have attached the integration test client to a module, you can detach it from the module when you have finished your testing.

About this task

To detach the integration test client from a module:

Procedure

  1. In the integration test client, click the Events tab to open the Events page.
  2. In the Events area, right-click the Attach event and select Detach. The integration test client is detached from the module.

What to do next

If you later decide that you want to reattach the integration test client to the module, ensure that the Attach event is selected in the Events area and then click the Continue icon Picture of the Continue icon.