Linking activities within parallel and generalized flow activities
Draft comment:
This topic was viewed 12 times since its publication
Links direct the sequence in which the execution of activities
occurs within parallel and generalized flow activities.
This topic was viewed 12 times since its publication
About this task
Procedure
Creating links in complex flows
About this task
Procedure
- Drop a parallel activities or generalized flow activity onto the canvas, and then drop the necessary activities into it.
- Locate one of the activities that you want to link.
The chosen activity can be the source or target of the intended link.
- Right-click the selected activity, then click Create
a Link From/To Here. This launches the Create a link window.
- Make the selected activity the source or the target of
the link. Select Create a link from here to make the activity the source of the link; select Create a link to here to make the activity the target of the link.
- Choose the activity that you want to connect to your selected
activity. Activities that are eligible to link to the selected activity are listed. Eligible activities are those which reside in the same structured activity. Select the activity by clicking on it. If the list is long, you can filter it, by typing the first few characters of the activity name in the text field. A message at the bottom of the screen describes the link that you are about to create, or provides information about why the link you are trying to create is not allowed.
- Optional: If you are working in a Generalized
flow activity, choose whether to create a standard link or a fault
link. Select the check box to select the link type.
- Create the link. Click OK.