PeriodsInHalf function

Applies to: TBM Studio and later

Returns the number of periods in the first or second half of the year.

Where to use

This function can be used in:
  • Data sets
  • Formula columns in report tables
  • Dynamic text

Syntax

PeriodsInHalf(half)

Arguments

Half

The number of the half, either 1 or 2 for the first or second half.

Return type

String

Example

Given a 13-period project, and period set to P10 FY2013, the following function returns the results shown below.

Function Return
PeriodsInHalf(1) 6
PeriodsInHalf(2) 7