Applies to: 2.16 and later. This feature will automate the staging calculations at a
project level and branch level.
To Enable Calc management Schedule navigate to Project > Enable Features, and then
select Show Calc Scheduler. A pop-up will appear to confirm that the feature is enabled.

Project Configuration
Navigate to Build tab on the TBM Studio Ribbon and select Calc
Schedule.

To create a schedule, do the following
- Click Create Schedule button.
- Enter Schedule Name.
- From the Weekly field, select the desired days to perform calculations.
- Select Re enable time to restart the calculations.
- Select Disable time to stop the calculations .
- Select Time zone.
- Click Submit button.
Created schedules can be applied to multiple projects.
It has the following information:
| Field |
Description |
| Project Name |
Name of the project |
| Branch |
Name of the Branch |
| Schedule Name |
Name of the Schedule. Select a schedule to assign to the project from the schedule list
dropdown. |
| Occurrence |
Display the days when the calculations happen |
| Disable Calc |
Display disable time to stop the calculation. |
| Re-enable Calc |
Display re-enable time to restart the calculation. |
Calc Configuration
To edit the existing schedule, select edit icon
- Once a calculation is initiated, editing the Re enable time or Disable time will
not terminate the current running calculations.
- While calculating, changes to the Re enable time or Disable time will only take
effect on future calculations.
To delete the existing schedule, select delete icon. Click
Confirm button on the warning
pop-up.
Note: To change the Re enable/disable state of a project, navigate to
Build >
Calc Management and manually edit
Disable/Enable Staging Calc as needed.