Powering off
Perform the following to power off Integrated Analytics System.
About this task
Typically, you would only power off the appliance if you are moving the appliance physically within the data center, or in the event of possible maintenance or emergency conditions within the data center.
Contact your IBM service representative for assistance in powering off the appliance.
Note: If disconnecting and reconnecting power from PDUs while the appliance running, disconnect only one PDU at a time. When reconnecting and powering on that PDU, before disconnecting another PDU, wait at least 60 seconds after applying power to the PDU for it to complete self-test, and verify that all LEDs are green.