Managing the CoD resources
If you use capacity management solutions in your environment to reduce the capacity on the backup hosts during non-disaster times, you can use the VM Recovery Manager DR solution to manage the resource allocations during a disaster recovery failover operation.
To manage the resource allocations in a disaster recovery environment, the VM Recovery Manager DR solution provides a resource pool provisioning (RPP) command that is called the ksysrppmgr command. The ksysrppmgr command optimizes available resources on the managed hosts. This command also minimizes your resource costs by optimizing the local consumption of pool resources.
Before you run the ksysrppmgr command to allocate resources to a managed host, you can run the ksysrppmgr command in check mode to simulate the execution and analyze the results.
- POWER® Enterprise Pool
- Elastic (On/Off) Capacity-on-Demand