Post-start actions on management of change records

Post-start actions are activities that you must complete following a change. For example, you might specify that as-built documentation is essential following a change, and assign that action (complete the documentation) to someone.

You add post-start actions to a management of change (MOC) record in the MOC application. You can add individual actions, or you can select from a list of standard actions or standard action groups. You can also assign either an owner or an owner group responsible for the post-start action.

If you select a standard action group or an owner group, the status of the group must be Active. Only those actions in the group that meet all the following conditions are added to the MOC record:

  • The status of the action record is Active.
  • The timing value of the action is POST START.
  • The action is a system-level action or its organization and site match the organization and site of the MOC record.

Individual actions that you add must meet the same conditions.