Risk matrix reports

In the Risk Matrix application, you can generate a risk matrix report by organization and severity. The report shows the likelihood, risk-based priority, and risk ranking of each consequence and severity combination that you defined.

You generate risk matrix reports by selecting Run Reports from the More Actions menu in the Risk Matrix application. You can specify the parameters that are shown in the following table.

Table 1. Risk matrix report parameters
Required Parameter name Multiple values allowed?
Yes Organization No
Yes Severity No
No Consequence Yes
No Description Yes
No Likelihood Yes
No Risk Rank Yes
No Risk Priority Yes
No Display Sequence Yes

Example of consequence risk matrix report

The following example shows a portion of a consequence risk matrix report.

Organization organizationName

Severity severityValue

Table 2. Sample consequence risk matrix report
Consequence Environment Environment Plant Plant Regulation Regulation Operations Operations
Likelihood Risk-based priority Risk ranking Risk-based priority Risk ranking Risk-based priority Risk ranking Risk-based priority Risk ranking
Almost certain 5 High 5 High 4 Low 3 Low
Likely 5 High 4 Low 3 Low 3 Low
Possible 4 Low 3 Low 2 Low 2 Low
Unlikely 3 Low 3 Low 2 Very Low 2 Very Low
Rare 2 Low 2 Very Low 1 Very Low 1 Very Low