Upgrade an existing Server to zSecure Visual 3.1.0
Use these guidelines and steps to upgrade an existing zSecure Visual Server.
For any upgrade, you must make sure that your local copies of the JCL (for example, in your JES procedure library when running the Visual Server as a started task) match the level of other zSecure components. These local JCL copies include the zSecure configuration that you use for Visual Server. For a new server instance, job CKRZPOST has prepared your configuration, but this preparation is not done when upgrading, because the configuration contains your customization, which the CKRZPOST job does not overwrite.
For information about upgrading the zSecure Visual software on an existing server using the normal procedure, see Upgrade a zSecure Visual Server using the normal procedure (without using a copy of the existing server).
For information about upgrading the software on a copy of an existing zSecure Visual server, see Upgrade a copy of an existing zSecure Visual Server. With such a copy in place, Visual Clients can still connect to the original server that has not been upgraded.