Preparing the 7063-CR1 system for operation after you remove and replace internal parts

Learn how to prepare the IBM 7063-CR1 Hardware Management Console system for operation after you remove and replace internal parts.

Procedure

  1. Ensure that you have the electrostatic discharge (ESD) wrist strap attached. If not, attach it now.
  2. Replace the service access cover. For instructions, see Installing the service access cover on a 7063-CR1 system.
  3. Place the system into the operating position. For instructions, see Placing a 7063-CR1 system into the operating position.
    (L012)
    Pinch hazard
    CAUTION:
    Pinch hazard. (L012)
  4. Reconnect the power cords to the system. For instructions, see Connecting the power cords to a 7063-CR1 system.
  5. Start the system. For instructions, see Starting the 7063-CR1 system.
  6. Verify the installed part. For instructions, see Verifying a repair.



Last updated: Tue, April 14, 2020