Removing and replacing parts
Use these procedures to remove and replace failing parts. These parts are referred to as field replaceable units (FRUs).
Note: See the International Information Bulletin for Customers - Installation of IBM® Machines (http://www.ibm.com/e-business/linkweb/publications/servlet/pbi.wss). This
bulletin (Publication number SC27-6601-00) provides a list of the key IBM system installation activities and those activities that might be billable
activities.
Before you begin a replacement, complete these tasks:
- If you are completing a replacement procedure that might put your data at risk, ensure, if possible, that you have a current backup of your system or logical partition (including operating systems, licensed programs, and data).
- Review the installation or replacement procedure for the feature or part.
- Note the significance of color on your system.
- The color terracotta on the part indicates you might not need to power off the system to complete service. This determination depends on your system configuration, and you might need to complete steps to prepare the system before a service action can be completed on the system with the system power turned on.
- The color blue on the part indicates that the procedure might require the system to be shut down before servicing. Check your service procedure before you attempt the repair.
- Ensure that you have access to a medium, flat-blade screwdriver, and a Phillips screwdriver.
- If parts are incorrect, missing, or visibly damaged, contact the provider of the part or your next level of support.
DANGER
When working on or around the system, observe the following
precautions:
Electrical voltage and current from power, telephone, and communication cables are
hazardous. To avoid a shock hazard:
- If IBM supplied the power cord(s), connect power to this unit only with the IBM provided power cord. Do not use the IBM provided power cord for any other product.
- Do not open or service any power supply assembly.
- Do not connect or disconnect any cables or perform installation, maintenance, or reconfiguration of this product during an electrical storm.
- The product might be equipped with multiple power cords. To remove all hazardous voltages,
disconnect all power cords.
- For AC power, disconnect all power cords from their AC power source.
- For racks with a DC power distribution panel (PDP), disconnect the customer’s DC power source to the PDP.
- When connecting power to the product ensure all power cables are properly connected.
- For racks with AC power, connect all power cords to a properly wired and grounded electrical outlet. Ensure that the outlet supplies proper voltage and phase rotation according to the system rating plate.
- For racks with a DC power distribution panel (PDP), connect the customer’s DC power source to the PDP. Ensure that the proper polarity is used when attaching the DC power and DC power return wiring.
- Connect any equipment that will be attached to this product to properly wired outlets.
- When possible, use one hand only to connect or disconnect signal cables.
- Never turn on any equipment when there is evidence of fire, water, or structural damage.
- Do not attempt to switch on power to the machine until all possible unsafe conditions are corrected.
- Assume that an electrical safety hazard is present. Perform all continuity, grounding, and power checks specified during the subsystem installation procedures to ensure that the machine meets safety requirements.
- Do not continue with the inspection if any unsafe conditions are present.
- Before you open the device covers, unless instructed otherwise in the installation and configuration procedures: Disconnect the attached AC power cords, turn off the applicable circuit breakers located in the rack power distribution panel (PDP), and disconnect any telecommunications systems, networks, and modems.
DANGER
- Connect and disconnect cables as described in the following procedures when installing, moving,
or opening covers on this product or attached devices. To Disconnect:To Connect:
- Turn off everything (unless instructed otherwise).
- For AC power, remove the power cords from the outlets.
- For racks with a DC power distribution panel (PDP), turn off the circuit breakers located in the PDP and remove the power from the Customer's DC power source.
- Remove the signal cables from the connectors.
- Remove all cables from the devices.
- Turn off everything (unless instructed otherwise).
- Attach all cables to the devices.
- Attach the signal cables to the connectors.
- For AC power, attach the power cords to the outlets.
- For racks with a DC power distribution panel (PDP), restore the power from the Customer's DC power source and turn on the circuit breakers located in the PDP.
- Turn on the devices.
Attention:
Failure to follow the step-by-step sequence for FRU removal or installation might result in FRU or system damage.
For safety, airflow purposes and thermal performance, the service access cover must be installed and fully seated before you power the system on.
For safety and airflow purposes and thermal performance, if you remove parts from the system, you must ensure that PCIe tail-stock fillers are present.
Use the following precautions whenever you handle electronic components or cables.
- The electrostatic discharge (ESD) kit and the ESD wrist strap must be used when you handle logic cards, single chip modules (SCM), multichip modules (MCM), electronic boards, and disk drives.
- Keep all electronic components in the shipping container or envelope until you are ready to install them.
- If you remove and then reinstall an electronic component, temporarily place the component on an ESD pad or blanket.