Use this procedure to perform an initial program load (IPL)
to dedicated service tools (DST).
This procedure is for the entire system, or if logical
partitions are installed, for the primary partition.
Perform
the following steps:
Select a type B IPL in manual mode.
Attention: For systems with logical partitions, you must power
down the secondary partitions normally before performing an IPL on
the primary partition to avoid possible data loss.
Perform one of the following options:
If there is a problem log entry after powering on the
system, perform a delayed power-off. (This is the data
for problem analysis.) When the system is off, press the Power button
on the control panel to perform an IPL. Select Function 03 if the
delayed power-off takes longer than 40 minutes to complete.
Attention: Performing function 03 might cause damage to objects,
and it might also cause data loss.
If there is an attention light after powering on the
system, use the increment (↑) or decrement (↓) button
to select control panel function 03. Press Enter on the control panel
to perform an IPL.
When the system is powered off, press the
Power button on the control panel to perform an IPL.
The IPL or
Install the System display is shown on the primary console.
Select the Use Dedicated Service Tools option. The DST
Sign On display is shown.
Remember: Enter a valid user ID and get the password
from the customer. If the customer has changed the full DST authority,
user ID, or password, ask the customer for the correct values.
Notes:
If prompted to change the password, be sure to provide the new
(changed) password to the customer.
You are limited to three sign-on attempts to DST. After three
unsuccessful attempts, the service tools user ID is disabled. A user
ID with a service tool security privilege must reset the ID.
The Use Dedicated Service Tools (DST) display is shown.
Restriction: The system is in the limited paging environment.