Use these guidelines to ensure that your server has the proper
power to operate.
Your server can have power requirements different from a PC (such
as, different voltage and different plugs).
IBM® supplies power cords with an attached plug that corresponds to
the power outlet most commonly used in the country or region to which the
product is being shipped. You, the customer, must supply the proper power
outlets.
- Plan for system electrical service. For information on power requirements
for a specific model, refer to the electrical section in the server
specifications for that particular server. For information on
power requirements for expansion units or peripherals, select the appropriate
device from the list of compatible
hardware specifications . For equipment not listed, check your equipment
documentation (owner's manuals) for specifications.
- Determine your server's plug and receptacle
type so you can have the proper outlets installed. Tip: Print
a copy of your plug and receptacle table and give it to your electrician.
The table contains information needed for installing outlets.
- Write down power information in your Server
Information Form 3A. Include:
- Plug type
- Input voltage
- Power cord length (optional)
- Plan for power outages. Consider purchasing an uninterruptible power
supply to protect your system against power fluctuations and outages. If your
company owns a uninterruptible power supply, involve your uninterruptible
power supply vendor with any type of uninterruptible power supply modification.
- Plan an emergency power-off switch. As a safety precaution, you should
provide some method for disconnecting power to all equipment in your server
area. Put emergency power-off switches in locations readily accessible to
your systems operator and at designated exits from the room.
- Ground your system. Electrical grounding is important both for safety
and correct operation. Your electrician should follow your national and local
electrical codes when installing the electrical wiring, outlets, and power
panels. These codes take precedence over any other recommendations.
- Contact an electrician. Contact a qualified electrician to take care
of your server power requirements and install needed power outlets. Give the
electrician a copy of your power information. You can print the recommended
power distribution wiring diagram as a reference for your electrician.