Manage history
You can access Manage History from the upper-right bar
![]()
With Manage History, you can manage versions of your processes and dashboards and move them between environments (for example, you can move a revision from the Quality Assurance (QA) environment to production).
History

For each project category (Analytics Dashboards, Filter Templates, and so on) History displays current and past versions, with the ability to roll back to a previous one.
To roll back a specific version, click it:

Packages
The Packages lists the available revisions for the current project.

The apply command overrides the current project configuration and its content. IBM Process Mining automatically generates a snapshot of the current configuration to safely roll back to the previous configuration.
Please note that:
- applying a backup with Filter Templates will override the existing filter templates;
- shared Filter templates imported on a new project through the backup are shared also in the new project.
By using the Create backup command, you can create a revision. You must include a description and the list of items to be included in the current package.

By clicking upload from disk, you can upload a previously created backup as a new package. You can also download a package to upload it in other projects.