z/OS DFSMS OAM Planning, Installation, and Storage Administration Guide for Object Support
Previous topic | Next topic | Contents | Contact z/OS | Library | PDF


Preparing for migration or installation

z/OS DFSMS OAM Planning, Installation, and Storage Administration Guide for Object Support
SC23-6866-00

Upon completion of any migration prerequisites, you should proceed with the following installation and migration checklist, paying particular attention to the guidance that is directed at installations that have had OAM installed previously.

Important: The term migration means to upgrade from one version of DFSMS to this current version. This assumes that you were previously using OAM for storing objects and that you will continue to use OAM for object storage upon installation of this current version or release. The term installation indicates that you have not installed OAM in any of the previous releases of z/OS, and are therefore installing OAM for the first time with this version of the product.

Table 1 outlines the steps required for a new installation or migrating up from a previous version of DFSMS. These steps are discussed in detail in this topic.

Table 1. Checklist for new installation or migration to a new release of OAM
Checklist steps New installation (z/OS V2R1) Migrate
Change DB2 installation parameters P V
Change Customer Information Control System (CICS) installation parameters P V
Configure the z/OS Unix file system P V

Modify the installation exit to:
Manage deleted objects
Notify when tape volume returned to scratch

P V
Change system libraries P P
Create DB2 databases for object tables and directories P V
Create OAM configuration database (OCDB) P V
Run sample migration jobs as required N V
Create and binding DB2 packages P P
Create OSR application plans* P* P*
Create OSMC application plans P P
Create LCS, ISMF, and OSR application plans P P
DB2 installation verification P P
Define user catalogs P V
Initial program load (IPL) the system P P
Specify the SMS definitions and programs used by OAM P V
Perform the OAM installation verification program P P
Optionally, update OAM to support new tape devices P V

*Perform only if NOT performing the Creating the LCS, ISMF, and OSR application plans step.

P = Perform
V = Verify (perform if necessary)
N = Do Not Perform

 

Go to the previous page Go to the next page




Copyright IBM Corporation 1990, 2014