Previous topic |
Next topic |
Contents |
Contact z/OS |
Library |
PDF
How JES2 fits into the z/OS system z/OS JES2 Introduction SA32-0994-00 |
|
During the life of a job, both JES2 and the base control program of z/OS® control different phases of the overall processing. Most jobs go through the following phases:
With the exception of the processing phase, all job phases are controlled by JES2. These phases are explained in more detail in JES2 job processing and functions. |
Copyright IBM Corporation 1990, 2014
|