Lock monitoring with the coupling facility structure activity report
The Coupling Facility Activity Report of z/OS® Resource Measurement Facility (RMF) describes activity to all structures in the coupling facility for a given time period.
The following figure shows a partial report, giving information
about:
- A : Total number of lock-related requests.
- B : Number of requests that were deferred because of contention.
- C : The number of deferred requests that were caused by false contention.
COUPLING FACILITY STRUCTURE ACTIVITY
STRUCTURE NAME = DSNDB0A_LOCK1 TYPE = LOCK
#REQ -------------- REQUESTS ------------ ------ DELAYED REQUESTS -----------
SYSTEM TOTAL # % OF -SERV TIME(MIC)- REASON # % OF ---AVG TIME(MIC)--- EXTERNAL REQUEST
NAME AVG/SEC REQ ALL AVG STD_DEV REQ REQ /DEL STD_DEV /ALL CONTENTIONS
STLABC2 126K SYNC 126K 51.0% 61.0 22.5 REQ TOTAL 162K A
701.7 ASYNC 0 0.0% 0.0 0.0 NO SCH 0 0.0% 0.0 0.0 0.0 REQ Deferred 612
CHNGD 0 0.0% INCLUDED IN ASYNC -CONT 621 B
-FALSE CONT212 C