ODM Optim Connect Server Installation

To install ODM Optim Connect on a z/OS® machine, refer to the z/OS Optim Connect Server Installation Guide, located in the Documentation subdirectory of the Optim™ z/OS Solution documentation CD.

Follow the procedures in the Installation Instructions and General Post Installation Procedures sections of the Installation Guide. In the section Preparing the Installation, omit Step 1 and begin with Step 2 (Execute the PREPARE member of the FOPnnn.TRANSMIT.LIB). In the General Post Installation Procedures section, perform only the following steps:

  1. Perform the procedures described in the Setting APF Authorization and Started Tasks section.
  2. Start the daemon using the following command:
    
    S ATTDAEMN
    
  3. Perform the procedures described in the Registering Optim Connect Server section. Use the license file provided by IBM® Optim. These procedures require Connect Studio. To configure Connect Studio, see Connect Studio Configuration.

After completing these General Post Installation Procedures, the ODM Optim Connect Server installation is complete. To complete the ODM Optim Connect installation, you must edit the Optim Connect USER.PROCLIB library and register the ODM Optim Connect driver, as described in Register ODM Optim Connect Driver.