subscribe iconSubscribe to this information
POWER7 information

Planning for CEC hot-node add and hot-node repair maintenance PDF

CEC hot-node add and hot-node repair maintenance provides the planning requirements for concurrently upgrading, repairing, or adding components to a system while the system is powered on.

Planning for CEC hot-node add and hot-node repair maintenance Link to PDF (approximately 5.0 MB)

Saving PDF files

Large PDF files can be difficult to open online. For best results, save the PDF file to your local drive for viewing or printing. Follow these steps:

  1. Right-click the PDF link in your browser.
  2. Click the option that saves the PDF locally.
  3. Navigate to the directory in which you want to save the PDF file.
  4. Click Save.

Downloading Adobe Reader

You need Adobe Reader installed on your system to view or print these PDF files. You can download a free copy from the Adobe Reader website.



Send feedback Rate this page

Last updated: Thu, July 23, 2015