Server specifications provide detailed information for your server, including dimensions, electrical, power, temperature, environment, and service clearances.
Use the following specifications to plan for your server.
Note: Redundant power and power cords are standard on the model 9406-825. The server uses dual alternating current power cords. For maximum availability, each of the power cords should be fed from independent power grids.
Pictured is the model 9406-825 server. The 5094 and 5095 expansion units are available with model 9406-825. Dimensions are shown for model 9406-825 only. |
![]() |
|||
| Dimensions | 9406-825 Width | 9406-825 Depth | 9406-825 Height | Height in 0551 rack2, 4 |
| Metric | 445 mm | 830 mm | 610 mm | 16 EIA |
| English | 17.5 in. | 32.7 in. | 24 in. | 16 U |
| Maximum configuration weight | 110 kg (242 lb.) | |||
| Electrical | ||||
| kVA | 1.540 | |||
| Thermal output (Btu/hr) | 4993 | |||
| Power requirements (watts) | 1463 | |||
| Rated voltage and frequency 3-way, 4-way, 5-way, and 6-way5 | 200-240 V ac at 50-60 plus or minus 0.5 Hz | |||
| Power factor | 0.95 | |||
| Inrush current | 125 A | |||
| Leakage current (maximum) | 3.5 mA | |||
| Phase | 1 | |||
| Compatible plug types | 5, 6, 10, 18, 19, 22, 23, 24, 25, 32, 34 | |||
| Power cord length | 2.7 m (9 ft.), 1.8 m (6 ft.) (U.S. and Canada only), 4.3 m (14 ft.) | |||
| Temperature requirements | ||||
| Operating | 10 degrees to 38 degrees C (50 degrees to 100.4 degrees F) | |||
| Nonoperating | 1 degrees to 60 degrees C (33.8 degrees to 140 degrees F) | |||
| Environment requirements | Operating | Nonoperating | ||
| Noncondensing humidity | 8 to 80% | 8 to 80% | ||
| Wet bulb temperature | 23 degrees C (73.4 degrees F) | 27 degrees C (80.6 degrees F) | ||
| Maximum altitude | 3048 m (10000 ft.) | |||
| Noise emissions1 | Operating | Idle | ||
| LWAd (Category 2D, General business) | 6.8 bels | 6.8 bels | ||
| LpAm (1-meter bystander) | 50 dB | 49 dB | ||
| Service clearances | ||||
| Front | Back | Sides3 | Top3 | |
| 762 mm | 762 mm | 762 mm | 762 mm | |
| 30 in. | 30 in. | 30 in. | 30 in. | |
Notes:
|
||||
You must prepare your environment to accept the new product based on the installation planning information provided, with assistance from an IBM® Installation Planning Representative (IPR) or IBM authorized service provider. In anticipation of the equipment delivery, prepare the final installation site in advance so that professional movers or riggers can transport the equipment to the final installation site within the computer room. If for some reason, this is not possible at the time of delivery, you must make arrangements to have professional movers or riggers return to finish the transportation at a later date. Only professional movers or riggers should transport the equipment. The IBM authorized service provider can only perform minimal frame repositioning within the computer room, as needed, to perform required service actions. You are also responsible for using professional movers or riggers when you relocate or dispose of equipment.