Installing the 7042-CR9 HMC into a rack
Learn how to install the 7042-CR9 Hardware Management Console (HMC) into a rack.
Complete a parts inventory. The following illustrations show the items that you need to install the server in the rack cabinet. If any items are missing or damaged, contact your place of purchase.
Figure 1. Cable management arm box contents

Figure 2. Rail box contents

Note: You need both the slide rail box and the cable management
arm box for this installation.
To install a 7042-CR9 HMC into a rack, complete the following
steps:
- Select an available space (depending on the server you
are installing) in your rack to install your server. Figure 3. Identifying a rack space
Note: You need 1 unit (1 U) of space and the slide rails are installed in the bottom unit (U) of the 1 unit of space. - Extend the outer slide member all the way
back until you hear an audible click. The rear rack mount bracket
is now rotated into the unlocked position. Figure 4. Slide rail and the outer slide member
Note: Each slide rail is marked as R (right) or L (left) on its end. - Align the rear end of the outer slide member against the
holes on the rear of the rack. Line up the pins and push the slide
in so that the pins go into the holes. The two slide pins protrude
through the top and bottom holes on the EIA flange. Push the slide
towards the rear of the rack until the rear rack mount bracket locks
into place. Figure 5. Align the pins with the holes in the rear of the rack

- Rotate the front latch to the open position
and align the front end of the outer slide member against the holes
on the front of the rack. Line up the pins with holes in the EIA flanges
and pull the slide forward so that the pins protrude through the holes.
Lock the front of the slide by allowing the front latch to rotate
to the closed position. Repeat steps 2- 4 for the other outer slide
member. Figure 6. Front slide rail latch

- Press on the release latches (1).
When you move the rack cabinet, or if you install the rack cabinet
in a vibration-prone area, tighten the captive M5 screws (2) in
the front of the server. Figure 7. Rack front rail and pins

- Pull the slide rails forward (1) until
they click, twice, into place. Carefully lift the server and tilt
it into position over the slide rails so that the rear nail heads (2) on
the server line up with the slots in the slide rails. Lower the server
down until the rear nail heads slide into the two rear slots, and
then slowly lower the front of the server (3) until
the other nail heads go into the other slots on the slide rails. Ensure
that the front latch covers the front nail head so that the system
is secured to the slide rails. Figure 8. Slide rails extended, server nail heads aligned with slots in rail, and lift points
Note: Use safe practices while lifting. If you are installing a 1 U server, ensure that you have two people when you lift the server. Their hands must be positioned as illustrated in Figure 8. - Lift the locking levers (1) on the
slide rails and push the server (2) all the
way into the rack until it clicks into place. Figure 9. Release latches and server

- The cable-management arm can be installed on either side
of the server. Figure 10 shows
it being installed on the left side. It is best to install the cable-management
arm so that it hinges on the side opposite to the power supplies to
provide access to the power supplies. To install the cable-management
arm on the right side, follow the instructions and install the hardware
on the opposite side. Place the pin down (1) into
the horizontal slot on the rear of the slide rails. Then rotate the
other end of the bar toward the rack (2) toward
the rack. Figure 10. Support arm connection
Note: The cable management support bar must be on top of the slide tab to work correctly. - Install the cable management stop bracket (with capital
letter O) on the unattached end of the support
arm. Ensure that the support arm is securely installed. Figure 11. Connecting the stop bracket to the slide rail
Note: The capital letter O is marked on cable management arm pins to identify the outside pins. - Place the cable-management arm on the support arm. Slide
the cable management arm tabs into both the inside and the outside
slots of the slide rail. Push the tabs until they snap into place. Figure 12. Cable-management arm connection

- To make it easier to rotate the cable management arm on
and off the cable management support arm, you can open the stop bracket
by pushing the tabs above and below the cable management support. Figure 13. Cable management support stop bracket

- Attach the power cords and other cables to the rear of
the server (including keyboard, monitor, and mouse cables, if required).
Route the cables and power cords on the cable-management arm and secure
them with cable ties or hook-and-loop fasteners. Note: The location of the cable straps might be slightly different in different systems. Use the cable straps that are provided on the rear of the system to retain the cables and prevent them from sagging.Figure 14. Attaching the Power cord and routing the cable

- Cables must be bundled with the cable strap for proper
movement of the cable management arm. Note: Ensure that the cables do not sag below the U space so they do not get caught on the lower systems. Allow slack in all cables to avoid tension in the cables as the cable-management arm moves.Figure 15. Hook-and-loop fastener

- If you are shipping the rack with the system installed
or if you are in a vibration-prone area, insert the M5 screws into
the rear of the slides. Use a cable tie to secure the free end of
the cable management arm to the rack if needed. Figure 16. Securing the server for shipping

Parent topic: Setting up the HMC