Maximo Asset Management 7.5.0.11 Interim Fix 012 released

Technical Blog Post


Abstract

Maximo Asset Management 7.5.0.11 Interim Fix 012 released

Body

The updated Interim Fix (IFIX) is available at Fix Central.

 

As with all IFIXes, Maximo Asset Management 7.5.0.11 Interim Fix 012 is cumulative and includes all fixes provided with MAM 75011 IFIX 011, with these additions:

 

APAR

Application Name

Description

IJ00575

System Object Security Scans

See Security Bulletin (CVE-2017-5662)

IJ01084

Scheduler

In Graphical Scheduling, the CPM incorrectly schedules interruptable WOs/tasks during non-working times when the duration is equal to the length of the shift and the tasks are connected with precedence relationships.

IV87677

Activities and Tasks

In the Activities and Tasks application, when you send a communication template, no entry is made in the commlog.

IV95944

Assets

In the Assets application, when you change the status of an asset that has active PMs associated with it, selecting the option to change the status of all the associated PMS to inactive, the asset is still in the operating state. The status of the asset did not change even though you received a message that states that the record has been saved.

IV99571

Assets

In the Assets application, you can classify specification values on decommisioned assets.

IV93280

Service Level Agreements

In the Service Level Agreements application, escalation emails are sent earlier than expected.

IV94484

Work Order Tracking

In the Work Order Tracking application, if you get an error message when you save a work order, reservations on material are not generated.

IV98201

The cogforcelogout.jsp page allows for specifying an arbitrary URL to be embedded within its Maximo URL to cause a redirection away from Maximo Asset Management. A pop up window opens that allows for this redirection. Redirection should not be possible.

IV96511

System User Interface

You can attach files files that do not have file extension types.

IJ00378

Report

In the Report application, on the Forecast report, projected PM labor requirements are not updated for all weeks.

 

To install the IFIX, see Installing an Interim Fix in Maximo 7.5.

 

[{"Business Unit":{"code":"BU059","label":"IBM Software w\/o TPS"},"Product":{"code":"SSLKT6","label":"IBM Maximo Asset Management"},"Component":"","Platform":[{"code":"PF025","label":"Platform Independent"}],"Version":"","Edition":"","Line of Business":{"code":"LOB59","label":"Sustainability Software"}}]