IBM Support

Time Zone Change issues with SCC

Technical Blog Post


Abstract

Time Zone Change issues with SCC

Body

Things to check or do after Daylight Saving Time, DST, change:

1) Restart the SCC Engine after the change.
2) Check the Engine, Local and preferred time is set correctly (system settings).
3) Check your SLC schedules timezone setting.

[{"Business Unit":{"code":"BU059","label":"IBM Software w\/o TPS"},"Product":{"code":"SS4PJT","label":"IBM Sterling Connect:Direct"},"Component":"","Platform":[{"code":"PF025","label":"Platform Independent"}],"Version":"","Edition":"","Line of Business":{"code":"LOB59","label":"Sustainability Software"}}]

UID

ibm11123515