With the fast-approaching end of life of VMware 6.5/6.7 and NSX-V, customers need to prepare and take action to perform migration activities.

Enterprises need to plan a seamless upgrade to VMware vSphere 7.x and VMware NSX-T and take advantage of the latest security, automation, network scalability and more.

IBM Cloud can help businesses upgrade to the latest vSphere and NSX-T. Before you start migrating your workloads, here are a few things to consider:

  1. Understanding workloads: Your existing NSX-V-based instance was deployed previously and it hosts the current workloads and NSX-V network configurations. For a smooth transition, it is key to understand the environment, the workloads that are deployed on it and the NSX-V with the underlay network configuration. 
  2. Analyse your capacity needs: Before you deploy a new NSX-T-based vCenter Server target, thoroughly estimate your capacity needs. Optimize and size your new hosts and clusters by using the latest hardware options available in IBM Cloud. If you’re not sure, you can check the latest options in the IBM Cloud for VMware Solutions console or contact your local sales representatives.
  3. Don’t forget your networking needs: You can deploy the new vCenter Server with NSX-T instance in new VLANs and a new pod, or you can use existing VLANs. 25GE NICs might not be available on the same pod. Also, you cannot move the subnets between VLANs if, for example, you need to reuse the public IP addresses. Analyse your networking needs and then decide.
  4. Network configurations from NSX-V to NSX-T: As the NSX-T architecture is different, you have the opportunity to design and implement the overlay network and configurations based on NSX-T best practices. NSX-T offers scripting capabilities, or you can use Terraform to define your topology. Alternatively, you can alternatively use the NSX-T Migration Coordination tool or third-party tools to migrate your existing network configurations, firewall and load-balancing rules.
  5. Layer 2 (L2) Network Extension with Bridging or HCX: L2 extension is typically used between NSX-V logical switches and NSX-T overlay segments. You can use either NSX-T Bridging or HCX Network Extension here. HCX provides tools for bulk and vMotion migrations, too.
  6. Choose your best option to migrate workloads: After your network configurations are migrated or prepared for migration, you can start to migrate your workloads between the environments. Here, you have a choice of various methods. With HCX, you have a single tool to do both L2 extension and migration. You can also use Advanced vMotion and storage vMotion between the environments. In addition, you can use services and tools from Zerto or Veeam.

The way forward

On IBM Cloud, the VMware NSX-V to VMware NSX-T migration is done by following the VMware® lift-and-shift migration model. In this approach, the IBM Cloud automation is used to deploy a new vCenter Server instance on the same or different VLANs. With this action, you can perform both NSX-V to NSX-T migration and workload migration:

This diagram demonstrates the lift-and-shift architecture utilizing the VMware Solutions automated deployment. The lift-and-shift migration approach enables you to do the following:

  • Plan the migration flexibly based on your workload requirements.
  • Adopt a modular migration approach; for example, partial subnet evacuation.
  • Configure a new network topology in the NSX-T environment.
  • Fail-back of a migration wave, as the existing NSX-V environment is still running.
  • Logically extend networks between both environments for smooth network migration.
  • Migrate the workloads gradually from NSX-V to NSX-T.

Learn more

IBM is committed to supporting its customers and making this migration as seamless as possible.

Check out the NSX V2T Migration and FAQ documentation:

As an alternative to the automation deployment, utilize the VPC Bare metal capabilities for the migration target by following the VPC roll-your-own solution tutorial.

IBM is committed to supporting its customers and making this migration as seamless as possible.

Categories

More from Cloud

Kubernetes version 1.28 now available in IBM Cloud Kubernetes Service

2 min read - We are excited to announce the availability of Kubernetes version 1.28 for your clusters that are running in IBM Cloud Kubernetes Service. This is our 23rd release of Kubernetes. With our Kubernetes service, you can easily upgrade your clusters without the need for deep Kubernetes knowledge. When you deploy new clusters, the default Kubernetes version remains 1.27 (soon to be 1.28); you can also choose to immediately deploy version 1.28. Learn more about deploying clusters here. Kubernetes version 1.28 In…

Temenos brings innovative payments capabilities to IBM Cloud to help banks transform

3 min read - The payments ecosystem is at an inflection point for transformation, and we believe now is the time for change. As banks look to modernize their payments journeys, Temenos Payments Hub has become the first dedicated payments solution to deliver innovative payments capabilities on the IBM Cloud for Financial Services®—an industry-specific platform designed to accelerate financial institutions' digital transformations with security at the forefront. This is the latest initiative in our long history together helping clients transform. With the Temenos Payments…

Foundational models at the edge

7 min read - Foundational models (FMs) are marking the beginning of a new era in machine learning (ML) and artificial intelligence (AI), which is leading to faster development of AI that can be adapted to a wide range of downstream tasks and fine-tuned for an array of applications.  With the increasing importance of processing data where work is being performed, serving AI models at the enterprise edge enables near-real-time predictions, while abiding by data sovereignty and privacy requirements. By combining the IBM watsonx data…

The next wave of payments modernization: Minimizing complexity to elevate customer experience

3 min read - The payments ecosystem is at an inflection point for transformation, especially as we see the rise of disruptive digital entrants who are introducing new payment methods, such as cryptocurrency and central bank digital currencies (CDBC). With more choices for customers, capturing share of wallet is becoming more competitive for traditional banks. This is just one of many examples that show how the payments space has evolved. At the same time, we are increasingly seeing regulators more closely monitor the industry’s…