IEAVEH061I   The system has been IPLed for between lowbound and highbound days. On the average depletion ASIDs have become non-reusable per day. At the current rate of depletion, the system will run out of ASIDs in n days.

Explanation

Check IEA_ASIDs has found that over the life of the IPL, ASIDs have become non-reusable at the indicated rate. If the trend continues, eventually insufficient ASIDs will remain available and a re-IPL will have to be scheduled.

The average depletion rate is based on current data. The rate might change and should be watched. If depletion continues at the current rate, a re-IPL will be necessary.

In the message text:
lowbound
The number of days rounded down
highbound
The number of days rounded up
depletion
The number of ASIDs that have become non-reusable per day, rounded up

System action

The system continues processing.

Operator response

N/A

System programmer response

Continue to monitor the depletion rate and schedule a re-IPL as necessary.

Problem determination

N/A

Source

Supervisor Control

Module

IEAVEHCK,IEAVEHMS

Routing code

N/A

Descriptor code

N/A

Automation

N/A