IEAVEH061I The system has been IPLed for between lowbound and highbound days. On the average depletion ASIDs have become non-reusable per day. At the current rate of depletion, the system will run out of ASIDs in n days.
Explanation
Check IEA_ASIDs has found that over the life of the IPL, ASIDs have become non-reusable at the indicated rate. If the trend continues, eventually insufficient ASIDs will remain available and a re-IPL will have to be scheduled.
The average depletion rate is based on current data. The rate might change and should be watched. If depletion continues at the current rate, a re-IPL will be necessary.
In the message text:
- lowbound
- The number of days rounded down
- highbound
- The number of days rounded up
- depletion
- The number of ASIDs that have become non-reusable per day, rounded up
System action
The system continues processing.
Operator response
N/A
System programmer response
Continue to monitor the depletion rate and schedule a re-IPL as necessary.
Problem determination
N/A
Source
Supervisor Control
Module
IEAVEHCK,IEAVEHMS
Routing code
N/A
Descriptor code
N/A
Automation
N/A