Planning for VSAM record-level sharing
Planning for and installing VSAM record-level sharing requires coordination with system hardware and software groups. The following planning tasks are described fully in
Administering VSAM record-level sharing
:
Determining hardware requirements
Determining applications that can use VSAM RLS
Ensuring same systems connectivity
Planning for availability
Defining sharing control data sets
Defining CF cache structures
Defining the primary CF lock structure
Modifying the SYS1.PARMLIB IGDSMSxx member
Establishing authorization for VSAM RLS
Parent topic:
Preparing for the Storage Management Subsystem