Previous topic |
Next topic |
Contents |
Contact z/OS |
Library |
PDF
Region origin z/OS MVS Program Management: User's Guide and Reference SA23-1393-00 |
|
The symbolic origin of every region, other than the first, must be specified with an OVERLAY statement. Once a new region is specified, a segment origin from a previous region should not be specified. In the sample multiple-region program, the symbolic origin THREE
is assigned to region 2, as shown in Figure 1.
Segments 6 and 7 are at load point THREE.
Figure 1. Symbolic segment and region origin in multiple-region
program
If the following is added to the sequence for the single-region
program, the multiple-region structure is produced:
|
Copyright IBM Corporation 1990, 2014
|