The target system is the system software libraries and other
data sets that you are installing. You log on to the driving system
and run jobs there to create or update the target system. Once the
target system is built, it can be IPLed on the same hardware (same
LPAR or same processor) or different hardware than that used for the
driving system.
ServerPac or SystemPac dump-by-data-set
installation:
- Install or upgrade target system hardware that you chose
in Step 1 and ordered in Step 2.
Reference information: related
product documentation.
- Review PSP buckets for the latest installation information.
Reference
information: PSP information.
- Prepare target system volumes for installation.
Reference
information: Preparing for installation.
- Receive the ServerPac or SystemPac order
to DASD.
Reference information: ServerPac: Using the Installation Dialog or SystemPac: CustomPac Dialog
Reference.
- Select the type of installation you prefer: full system
replacement or software upgrade. Each requires a different amount
of work and a different order of tasks.
Reference information: ServerPac: Using the Installation Dialog or SystemPac: CustomPac Dialog
Reference.
- Create and tailor the work configuration.
Reference
information: ServerPac: Using the Installation Dialog or SystemPac: CustomPac Dialog
Reference.
- Run installation jobs. The jobs install distribution and
target libraries for your target system.
Reference information: ServerPac:
Installing Your Order or SystemPac Installation Guide.
- Review system HOLDs and latest Enhanced HOLDDATA in the
CPAC.DOCLIB data set in the ServerPac or SystemPac order and at http://service.boulder.ibm.com/390holddata.html.
Reference
information: Maintenance after installation.
- Run element-specific post-installation jobs on the driving
system.
Reference information: ServerPac: Installing
Your Order or SystemPac Installation
Guide.
- If upgrading, perform pre-first-IPL migration tasks
for z/OS®. These migration
actions were identified in Step 1 and have a timing of "before the
first IPL of z/OS V2R1" in z/OS Migration.
Reference
information: z/OS publications
(http://www.ibm.com/eserver/zseries/zos/bkserv/)
- If upgrading, perform pre-first-IPL migration tasks for IBM® middleware, IBM applications, and ISV products. These
migration actions were identified in Step 1.
Reference information: IBM product publications and ISV
publications.
- IPL the target system and log on.
Reference information: ServerPac:
Installing Your Order or SystemPac Installation Guide.
- Run element-specific post-installation jobs on the target system.
Reference
information: ServerPac: Installing Your Order or SystemPac Installation Guide.
- Run installation verification programs (IVPs).
Reference
information: ServerPac: Installing Your Order or SystemPac Installation Guide.
- Download client code to workstations, if applicable.
Reference
information: element-specific documentation.
- Apply service to target system software, if necessary.
Reference
information: If you are installing a z/OS ServerPac or Product ServerPac order . . . or If you are installing a z/OS SystemPac order....
- Save the customized configuration.
Reference information: ServerPac: Using the Installation Dialog or SystemPac: CustomPac Dialog
Reference.
- Back up the system.
Reference information: Making a copy of your system software (cloning).
CBPDO installation:
- Install or upgrade target system hardware.
Reference
information: related product documentation.
- Review PSP buckets for the latest installation information.
Reference
information: PSP information.
- Clone the system.
Reference information: Making a copy of your system software (cloning).
- Update SMP/E zone entries.
Reference information: For
the z/OS Program Directory, see the z/OS installation related informationwebsite.
- Create "FMIDSETs" that you will install in stages called "waves".
Reference
information: See the z/OS Program Directory at the z/OS installation related information website.
- Install Wave 0.
See the z/OS Program Directory at the z/OS installation related information website.
- Install Wave 1 and, if upgrading, perform pre-first-IPL
migration tasks for z/OS, IBM middleware, IBM applications, and ISV products. (The
pre-first-IPL migration tasks for z/OS were
identified in Step 1 and have a timing of "before the first IPL
of z/OS V2R1" in z/OS Migration.)
Reference
information: z/OS publications
(http://www.ibm.com/eserver/zseries/zos/bkserv/), IBM product publications, and ISV
publications.
- Install Wave 2 and, if upgrading, perform pre-first-IPL
migration tasks for z/OS, IBM middleware, IBM applications, and ISV products. (The
pre-first-IPL migration tasks for z/OS were
identified in Step 1 and have a timing of "before the first IPL
of z/OS V2R1" in z/OS Migration.)
z/OS
Program Directory at the z/OS installation related information website,
and z/OS publications (http://www.ibm.com/eserver/zseries/zos/bkserv/), IBM product publications, and ISV
publications.
- Download client code to workstations, if applicable.
Reference
information: element-specific documentation.
- Apply service to target system software, if necessary.
Reference
information: If you are installing a z/OS CBPDO order....
- Back up the system.
Reference information: Making a copy of your system software (cloning).
SystemPac full volume
dump installation:
- Install or upgrade target system hardware.
Reference
information: related product documentation.
- Review PSP buckets for the latest installation information.
Reference
information: PSP information.
- Prepare target system volumes for restore.
- Initialize volumes.
Reference information: SystemPac Installation Guide.
- Unload the tapes to the initialized volumes.
Reference
information: SystemPac Installation
Guide.
- If upgrading, perform pre-first-IPL migration tasks
for z/OS. These migration
actions were identified in Step 1 and have a timing of "before the
first IPL of z/OS V2R1" in z/OS Migration.
Reference
information: z/OS publications
(http://www.ibm.com/eserver/zseries/zos/bkserv/)
- If upgrading, perform pre-first-IPL migration tasks for IBM middleware, IBM applications, and ISV products. These
migration actions were identified in Step 1.
Reference information: IBM product publications and ISV
publications.
- IPL the target system and log on.
Reference information: SystemPac Installation Guide.
- Run post-installation jobs after IPL.
Reference information: SystemPac Installation Guide.
- Verify installation.
Reference information: SystemPac Installation Guide.