Previous topic |
Next topic |
Contents |
Index |
Contact z/OS |
Library |
PDF
Verify an I/O configuration z/OS HCD User's Guide SC34-2669-00 |
|
Verify an I/O configurationHCD allows you to check the definitions in your IODF against the actual configuration as sensed from the active system. This can be done using TSA I/O Operations (see Prerequisites for the prerequisites) or zDAC. The verify function results in a list of all sensed paths in comparison to the defined paths. Using a filter, this usually extensive list can be reduced to the data of interest. The list can be saved and/or printed. The verification can also be carried out as a batch job resulting in an I/O Path Report (see the example Figure 186 in section Print configuration reports). |
Copyright IBM Corporation 1990, 2014
|