ProgressMessage
This parameter determines whether users have
the option to cancel lengthy view calculations.
When a user opens a view that takes a significant amount of time to calculate (usually a view with high levels of consolidation or complex rules), IBM® Cognos® TM1® monitors the progress of the process. When ProgressMessage=T a dialog box opens that allows the user to Stop Building View.
Parameter type: optional, static
If the user clicks Stop Building View, the view is discarded on the client, but view calculation continues on the server. In some instances, this can tie up the server.
- If ProgressMessage=F, the Stop Building View option is not offered and the user cannot cancel lengthy operations. This setting helps avoid potential server tie ups in versions 9.1 SP3 through 9.4.
- When ProgressMessage=T or is not present in the Tm1s.cfg file, the Stop Building View option opens during lengthy view calculations so the user can cancel the process if necessary. For versions 9.4 or later, the user can assign a unique Port Number using ClientMessagePortNumber. This additional port allows these progress messages to travel via a secondary port so that server processing can continue without tying up thread reserves.
Note: To avoid potentially tying up servers, Cognos TM1 9.1
SP3 through 9.4 have ProgressMessage=F inserted into the Tm1s.cfg
file during server installation. As of Cognos TM1 9.4,
progress messages can travel via the secondary port assigned by ClientMessagePortNumber
so Cognos TM1 9.4
and later have ProgressMessage=T set by default.