Validating cables in the 9080-M9S system

You can use the Advanced System Management Interface (ASMI) to validate cables in the system and to identity issues such as unplugged cables, incorrect connection, and incorrect cable length.

About this task

Cable validation occurs automatically during system power on. To validate cables manually:
To display cable status, go to Displaying the status of FSP, UPIC, and SMP cables in the 9080-M9S system.
Notes:
  • The FSP and SMP cables cannot be manually verified with the system power turned on. The cable status that is displayed is the result of the last cable validation that occurred. Cable validation occurs automatically during system power on.
  • If the system firmware level is earlier than FW940.00, the UPIC cables cannot be manually verified when the system power is turned on. The cable status that is displayed is the result of the last cable validation that occurred. Cable validation occurs automatically during system power on.