What's new in Installing and configuring the HMC
Read about new or significantly changed information in the Installing and configuring the HMC topic since the previous update of the topic collection.
April 2021
- Added the following topics:
- Installing the IBM Power Systems HMC (7063-CR2) into a rack
- Prerequisites for installing the rack-mounted 7063-CR2 system
- Completing inventory for your system
- Determining and marking the location in the rack for the 7063-CR2 system
- Attaching the adjustable rails to the system chassis and to the rack
- Attaching the fixed rails to the system chassis and to the rack
- Installing the system into the rack and connecting and routing power cables
- Cabling the rack-mounted 7063-CR2 HMC
- Configuring the 7063-CR2 HMC
November 2020
- Updated the following topics:
July 2020
- Updated the following topics:
October 2019
- Updated the following topics:
February 2019
August 2018
- Updated the following topics:
December 2017
- Added information for IBM Power Systems servers that contain the POWER9 processor.