Troubleshooting
Problem
DataStage job failes with "Bad File Descriptor" when using MQ in parallel on MPP (cluster or GRID) configuration
Resolving The Problem
Running MQ connector in Parallel on MPP (cluster or GRID) configuration may cause a timing issue with End of Wave processing. There are 2 workarounds:
1. When running MQ connector on MPP, run the MQ connector sequentially.
2. Run the MQ connector only on the conductor node by using node pool constraints or node constraint.
This issue has been resolved in IS 9.1.
[{"Product":{"code":"SSVSEF","label":"IBM InfoSphere DataStage"},"Business Unit":{"code":"BU059","label":"IBM Software w\/o TPS"},"Component":"--","Platform":[{"code":"PF016","label":"Linux"}],"Version":"8.1;8.5;8.7","Edition":"","Line of Business":{"code":"LOB10","label":"Data and AI"}}]
Was this topic helpful?
Document Information
Modified date:
16 June 2018
UID
swg21622981