Fixes are available
Operational Decision Manager V8.7.1.1: Interim Fix 39
Operational Decision Manager V8.8.0.1 Fix Pack
Operational Decision Manager V8.7.1.1: Interim Fix 43
Operational Decision Manager V8.7.1.1: Interim Fix 48
Operational Decision Manager V8.8.1 Mod Pack
Operational Decision Manager V8.7.1.2 Fix Pack
Operational Decision Manager V8.8.1 Download Document
Operational Decision Manager V8.7.1.1: Interim Fix 53
Operational Decision Manager z/OS 8.8.0.1 Fix Pack
APAR status
Closed as program error.
Error description
Create a new test suite in a new change activity and run the test suite. Complete the change activity and create a new change activity. The test suite will now show as not run. Run the test suit and complete the second change activity and create a third new change activity. Now the test suite will point to a report created in the previous activty.
Local fix
Problem summary
the report iis built using the current baseline and not the baseline of the activity
Problem conclusion
The code is fixed
Temporary fix
Comments
APAR Information
APAR number
RS02250
Reported component name
WS DECISION CTR
Reported component ID
5725B6900
Reported release
871
Status
CLOSED PER
PE
NoPE
HIPER
NoHIPER
Special Attention
NoSpecatt
Submitted date
2015-12-11
Closed date
2015-12-13
Last modified date
2015-12-13
APAR is sysrouted FROM one or more of the following:
APAR is sysrouted TO one or more of the following:
Modules/Macros
999
Fix information
Fixed component name
WS DECISION CTR
Fixed component ID
5725B6900
Applicable component levels
R871 PSY
UP
[{"Business Unit":{"code":"BU059","label":"IBM Software w\/o TPS"},"Product":{"code":"SSQP76","label":"IBM Operational Decision Manager"},"Platform":[{"code":"PF025","label":"Platform Independent"}],"Version":"8.7.1","Line of Business":{"code":"LOB45","label":"Automation"}}]
Document Information
Modified date:
07 January 2022