IBM Support

PM97103: DOCUMENTATION UPDATES TO TRANSFOMRER USER GUIDE FOR PCACTIVATE AND -G SWITCH

Subscribe

You can track all active APARs for this component.

 

APAR status

  • Closed as fixed if next.

Error description

  • Update requested to the Transformer User Guide around the use of
    pcactivate. Client version is 10.1.1 but this is an applicable
    update to all supported versions of Cognos 8 and Cognos 10
    Transformer.????Item # 1:????Requesting that more detail or a
    "additional note" be placed on the section surrounding
    pcactivate as such and please note the exact context does not
    have to be exact as long as the message is still
    delivered:??????????"When using pcactivate if there is a cube (
    .mdc ) that is in the location you are trying to use that
    pcativate will quit because of this.  ??It will see this file
    and realize it's not a 'stub' file but the actual cube and thus
    can not complete the pcactivate process.                    ??
    
          ??If you delete / rename the cube from that location and
    run pcactivate you will be good to go for that run and all runs
    after that."    ??????Item # 2:????Update the information
    surrounding the -g switch for command line options.????"When
    using -g for a deployment between two servers that a UNC pat
    will work unless it is Solaris environment. If it is Solaris
    then a nfs  ??/ share & mount solution will have to be put into
    place."                 ??
                                      ??This update is specific to
    the Transformer UNIX guide
    

Local fix

Problem summary

  • ****************************************************************
    * USERS AFFECTED:                                              *
    * All Users                                                    *
    ****************************************************************
    * PROBLEM DESCRIPTION:                                         *
    * See error description                                        *
    ****************************************************************
    * RECOMMENDATION:                                              *
    * Upgrade to IBM Cognos Business Intelligence 10.2 Refresh     *
    * Pack 2                                                       *
    ****************************************************************
    

Problem conclusion

Temporary fix

Comments

APAR Information

  • APAR number

    PM97103

  • Reported component name

    COG TRANSFORMER

  • Reported component ID

    5724W12TR

  • Reported release

    A11

  • Status

    CLOSED FIN

  • PE

    NoPE

  • HIPER

    NoHIPER

  • Special Attention

    NoSpecatt

  • Submitted date

    2013-09-16

  • Closed date

    2014-11-24

  • Last modified date

    2014-11-26

  • APAR is sysrouted FROM one or more of the following:

  • APAR is sysrouted TO one or more of the following:

Fix information

Applicable component levels

  • RA22 PSN

       UP

[{"Business Unit":{"code":"BU048","label":"IBM Software"},"Product":{"code":"SSCRGHX","label":"Transformer"},"Component":"","ARM Category":[],"Platform":[{"code":"PF025","label":"Platform Independent"}],"Version":"10.1.1","Edition":"","Line of Business":{"code":"","label":""}}]

Document Information

Modified date:
26 November 2014