APAR status
Closed as program error.
Error description
Customer CWA report contains the following calculation in a DQM report. This calculation makes BIBusTKServerMain process shutdown.(No dmp files) Calculated Measure AB(*1) / Calculated Measure CD(*1) -1 (*1) = Measure A * Measure B (*2) = Measure C * Measure D This issue doesn't occurs on 10.2 CQM and 10.2.1 CQM/DQM.
Local fix
Use the following calculation. (Measure A/Measure C) * (Measure B/Measure D) -1
Problem summary
**************************************************************** * USERS AFFECTED: * * 10.2 DQM user * **************************************************************** * PROBLEM DESCRIPTION: * * See error description. * **************************************************************** * RECOMMENDATION: * * Upgrade to IBM Cognos Business Intelligence 10.2.1 Fix Pack * * 1 * * or IBM Cognos Business Intelligence 10.2 Fix Pack 2 * ****************************************************************
Problem conclusion
Code Fix
Temporary fix
Comments
APAR Information
APAR number
PM91063
Reported component name
COG REPORT STUD
Reported component ID
5724W12RS
Reported release
A20
Status
CLOSED PER
PE
NoPE
HIPER
NoHIPER
Special Attention
NoSpecatt
Submitted date
2013-06-13
Closed date
2014-03-31
Last modified date
2014-03-31
APAR is sysrouted FROM one or more of the following:
APAR is sysrouted TO one or more of the following:
Fix information
Fixed component name
COG REPORT STUD
Fixed component ID
5724W12RS
Applicable component levels
RA20 PSN
UP
[{"Business Unit":{"code":"BU048","label":"IBM Software"},"Product":{"code":"SSCHNWW","label":"Report Authoring v11x"},"Component":"","ARM Category":[],"Platform":[{"code":"PF025","label":"Platform Independent"}],"Version":"A20","Edition":"","Line of Business":{"code":"","label":""}}]
Document Information
Modified date:
31 March 2014