IBM Support

PM89779: Symbol layering options (send to back/front or send back/forwards) not working correctly

Subscribe

You can track all active APARs for this component.

 

APAR status

  • Closed as Permanent restriction.

Error description

  • In SA, we have the symbol layering options: Send to the Front,
    Send to the Back, Bring Forwards, or Send Backwards.
    
    The understanding is that when you select the Bring Forwards and
    Send Backwards options, the symbol will be sent one level
    back/front. Also, the Bring to the Front and Send to the Back
    otpions would send the symbol to the top or bottom level. This
    doesn?t appear to work in that way in SA.
    
    Basically the Bring Forwards and Bring to the Front options are
    producing the same results. The same is true of Send Backwards
    and Send to the Back options.
    
    1) Go to Format \ Diagram Format \ Symbol Display Layering.
    2) Select user Control
    3) Open any diagram, example Data Flow Gane and Sarson
    4) Stack several Node symbols (example External) on top of each
    other
    5) For the 'bottom' symbol right click, slect Symbol Layering \
    Bring to Front. Observe the position.
    6) Edit \ Undo
    7) For the 'bottom' symbol right click, slect Symbol Layering \
    Bring Forwards. Observe the position. It is the same as in step
    5
    8) For the 'top' symbol right click, slect Symbol Layering \
    Send to the Back. Observe the position.
    9) Edit \ Undo
    10) For the 'top' symbol right click, slect Symbol Layering \
    Send Backwards. Observe the position. It is the same as in step
    8
    

Local fix

Problem summary

  • ****************************************************************
    * USERS AFFECTED:                                              *
    ****************************************************************
    * PROBLEM DESCRIPTION:                                         *
    ****************************************************************
    * RECOMMENDATION:                                              *
    ****************************************************************
    No plan to fix
    

Problem conclusion

  • No plan to fix
    

Temporary fix

Comments

APAR Information

  • APAR number

    PM89779

  • Reported component name

    TLOGIC SYS ARCH

  • Reported component ID

    5724V68SA

  • Reported release

    B41

  • Status

    CLOSED PRS

  • PE

    NoPE

  • HIPER

    NoHIPER

  • Special Attention

    NoSpecatt

  • Submitted date

    2013-05-24

  • Closed date

    2014-07-28

  • Last modified date

    2014-07-28

  • APAR is sysrouted FROM one or more of the following:

  • APAR is sysrouted TO one or more of the following:

Fix information

Applicable component levels

[{"Business Unit":{"code":"BU053","label":"Cloud & Data Platform"},"Product":{"code":"SS6RBX","label":"Rational System Architect"},"Component":"","ARM Category":[],"Platform":[{"code":"PF025","label":"Platform Independent"}],"Version":"11.4.1","Edition":"","Line of Business":{"code":"LOB45","label":"Automation"}}]

Document Information

Modified date:
28 July 2014