Fixes are available
APAR status
Closed as program error.
Error description
Environment: Windows 7 Product name: IBM? Rational? Business Developer Program Version : 8.5.1 Description: A performance decrease is observed with code completion functions within the workspace when associated with large EGLAR file references on the build path. Using such as an 'F3' (open on selection) operation on a record will take up to 5 seconds with the large EGLAR file reference. Without the EGLAR file reference the same function, operation will be activated almost instantaneously.
Local fix
Problem summary
When eglars are attached to a project, a noticeable performance decrease can be seen when using some utilities, such as "open on selection" and content assist.
Problem conclusion
The EGLAR entry for the working copy compiler is now intialized with the EDT builder's EGLAR entry, to avoid having to open the eglar to find what parts it contains.
Temporary fix
Comments
APAR Information
APAR number
PM83235
Reported component name
RATL BUS DEV
Reported component ID
5724S5000
Reported release
850
Status
CLOSED PER
PE
NoPE
HIPER
NoHIPER
Special Attention
NoSpecatt
Submitted date
2013-02-20
Closed date
2013-10-28
Last modified date
2013-10-28
APAR is sysrouted FROM one or more of the following:
APAR is sysrouted TO one or more of the following:
Fix information
Fixed component name
RATL BUS DEV
Fixed component ID
5724S5000
Applicable component levels
R850 PSY
UP
[{"Business Unit":{"code":"BU058","label":"IBM Infrastructure w\/TPS"},"Product":{"code":"SSMQ79","label":"Rational Business Developer"},"Component":"","ARM Category":[],"Platform":[{"code":"PF025","label":"Platform Independent"}],"Version":"8.5","Edition":"","Line of Business":{"code":"LOB35","label":"Mainframe SW"}}]
Document Information
Modified date:
28 October 2013