A fix is available
APAR status
Closed as program error.
Error description
You are using IBM Rational Rhapsody 7.6.1.1 on Windows 7. You have imported some legacy code via the Reverse Engineering process. When you drag a function from the browser onto an Activity diagram you get an error: 'Cannot synchronize pins with operation because one of the operation arguments is an on-the-fly type.' Currently, the only workaround is to change the arguments in the function from on-the-fly to a modeled type. Drag the function to the Activity diagram. Then change the function back to the on-the-fly type.
Local fix
Problem summary
**************************************************************** * USERS AFFECTED: * **************************************************************** * PROBLEM DESCRIPTION: * **************************************************************** * RECOMMENDATION: * **************************************************************** RPH 7611 Cannot synchronize pins with operation because one of the operation arguments is an on-the-fly type.
Problem conclusion
Fixed in 7.6.1.3
Temporary fix
Comments
APAR Information
APAR number
PM75827
Reported component name
TLOGIC RHAPSODY
Reported component ID
5724V74RP
Reported release
761
Status
CLOSED PER
PE
NoPE
HIPER
NoHIPER
Special Attention
NoSpecatt
Submitted date
2012-10-24
Closed date
2012-12-13
Last modified date
2012-12-13
APAR is sysrouted FROM one or more of the following:
APAR is sysrouted TO one or more of the following:
Fix information
Fixed component name
TLOGIC RHAPSODY
Fixed component ID
5724V74RP
Applicable component levels
R761 PSN
UP
[{"Business Unit":{"code":"BU059","label":"IBM Software w\/o TPS"},"Product":{"code":"SS7P9W","label":"Rational Rhapsody"},"Platform":[{"code":"PF025","label":"Platform Independent"}],"Version":"7.6.1","Line of Business":{"code":"LOB59","label":"Sustainability Software"}}]
Document Information
Modified date:
29 October 2021