APAR status
Closed as program error.
Error description
Prior to installing 10.1.6301.1007 HTML attachments sent from Event Studio via an email task appeared in the body of the email. After installing the hotsite the HTML output is not displayed in the body but attached as mht. The event studio is contains a report run task to save the report and an email task to email an attachment.
Local fix
Problem summary
**************************************************************** * USERS AFFECTED: * * All Users * **************************************************************** * PROBLEM DESCRIPTION: * * See error description. * **************************************************************** * RECOMMENDATION: * * Upgrade to IBM Cognos Business Intelligence 10.1.1 Fix Pack * * 2 * * or Upgrade to IBM Cognos Business Intelligence 10.2 Refresh * * Pack 1 * ****************************************************************
Problem conclusion
Code Fix
Temporary fix
Comments
APAR Information
APAR number
PM71944
Reported component name
COG MOBILE
Reported component ID
5724W20GM
Reported release
A11
Status
CLOSED PER
PE
NoPE
HIPER
NoHIPER
Special Attention
NoSpecatt
Submitted date
2012-08-30
Closed date
2013-03-28
Last modified date
2013-06-11
APAR is sysrouted FROM one or more of the following:
APAR is sysrouted TO one or more of the following:
Fix information
Fixed component name
COG MOBILE
Fixed component ID
5724W20GM
Applicable component levels
RA11 PSN
UP
[{"Business Unit":{"code":"BU059","label":"IBM Software w\/o TPS"},"Product":{"code":"SSEN9H","label":"IBM Cognos Mobile"},"Component":"","ARM Category":[],"Platform":[{"code":"PF025","label":"Platform Independent"}],"Version":"10.1.1","Edition":"","Line of Business":{"code":"LOB10","label":"Data and AI"}}]
Document Information
Modified date:
22 March 2021