APAR status
Closed as fixed if next.
Error description
When deploying a set of packages/reports from a higher environment back to a lower, and the package target path/name changes, the drill-through and component Reference links will not update on reports which need to be re-validated due to past model changes. ??If the same report was opened in Report Studio, re-validated and saved prior to export, the links within the report will update successfully, even though there is no difference in the spec post re-validation.??Error that appears in the cogserver.log is:?ReportService??Failure?RSV-CM-0005 Content Manager did not return an object for the requested search path '<path to component reference layout>'.?
Local fix
Problem summary
**************************************************************** * USERS AFFECTED: * * All Users * **************************************************************** * PROBLEM DESCRIPTION: * * See error description. * **************************************************************** * RECOMMENDATION: * * Upgrade to IBM Cognos Business Intelligence 10.2 Refresh * * Pack 1 * ****************************************************************
Problem conclusion
Temporary fix
Comments
APAR Information
APAR number
PM70901
Reported component name
COG CONNECTION
Reported component ID
5724W12CC
Reported release
841
Status
CLOSED FIN
PE
NoPE
HIPER
NoHIPER
Special Attention
NoSpecatt
Submitted date
2012-08-14
Closed date
2013-06-11
Last modified date
2013-06-11
APAR is sysrouted FROM one or more of the following:
APAR is sysrouted TO one or more of the following:
Fix information
Applicable component levels
RA21 PSN
UP
[{"Business Unit":{"code":"BU048","label":"IBM Software"},"Product":{"code":"SSCHNWN","label":"Portal v11x"},"Component":"","ARM Category":[],"Platform":[{"code":"PF025","label":"Platform Independent"}],"Version":"841","Edition":"","Line of Business":{"code":"","label":""}}]
Document Information
Modified date:
11 June 2013