APAR status
Closed as program error.
Error description
Details:??Client upgraded from 10.1 to 10.1.1 and have determined that a C<A link that ran fine in 10.1 now no longer runs in 10.1.1.??If we modify the link and select a smaller subset of dimension elements we can run the link successfully.??I have determined through a local testcase that this issue seems to be in relation to the workspace size setting. I can progressively add more items to the selection following an increase to the workspace size setting.??Question:?Is this a defect or is there something else that needs to be looked at?
Local fix
Problem summary
**************************************************************** * USERS AFFECTED: * * All Users * **************************************************************** * PROBLEM DESCRIPTION: * * See error description. * **************************************************************** * RECOMMENDATION: * * Upgrade to Cognos Planning 10.1.1 Fix Pack 2 * ****************************************************************
Problem conclusion
Code Fix
Temporary fix
Comments
APAR Information
APAR number
PM68073
Reported component name
COG PLAN ANALYS
Reported component ID
5724W23PA
Reported release
A11
Status
CLOSED PER
PE
NoPE
HIPER
NoHIPER
Special Attention
NoSpecatt
Submitted date
2012-07-03
Closed date
2012-11-29
Last modified date
2012-11-29
APAR is sysrouted FROM one or more of the following:
APAR is sysrouted TO one or more of the following:
Fix information
Fixed component name
COG PLAN ANALYS
Fixed component ID
5724W23PA
Applicable component levels
RA11 PSN
UP
[{"Business Unit":{"code":"BU059","label":"IBM Software w\/o TPS"},"Product":{"code":"SSPN2D","label":"Cognos Planning"},"Component":"","ARM Category":[],"Platform":[{"code":"PF025","label":"Platform Independent"}],"Version":"10.1.1","Edition":"","Line of Business":{"code":"LOB10","label":"Data and AI"}}]
Document Information
Modified date:
06 March 2023