IBM Support

PM62243: PDF Large List report causes all PDF reports to get slower and hung WAS threads during stability testing

Subscribe

You can track all active APARs for this component.

 

APAR status

  • Closed as program error.

Error description

  • While running a 400 user stability test on Cognos BI, kit
    10.2.1000.14, we observed that running a largePDF report
    suddenly caused the following issues when introduced mid test
    into stability:  1.  We ran 3 days without the PDF LargeList
    report in the mix.  Most report executions during stability were
    taking less than 10 seconds.  2.  Introduced the PDF LargeList
    report, report execution for this one report took as high as
    2500 seconds, and caused all other PDF reports to get
    signficantly slower.  3.  This caused excessive hung threads in
    WAS at the time we introduced this report.  4.  About three
    hours later, this report was removed, and all hung threads and
    report transaction response times returned to normality.
    

Local fix

Problem summary

  • ****************************************************************
    * USERS AFFECTED:                                              *
    * All Users                                                    *
    ****************************************************************
    * PROBLEM DESCRIPTION:                                         *
    * See error description.                                       *
    ****************************************************************
    * RECOMMENDATION:                                              *
    * Upgrade to Cognos BI Server 10.2 or                          *
    * Upgrade to IBM Cognos Business Intelligence 10.1.1 Fix Pack  *
    * 2                                                            *
    ****************************************************************
    

Problem conclusion

  • Code Fix
    

Temporary fix

Comments

APAR Information

  • APAR number

    PM62243

  • Reported component name

    COG8 BI INST CO

  • Reported component ID

    5724W12IC

  • Reported release

    A11

  • Status

    CLOSED PER

  • PE

    NoPE

  • HIPER

    NoHIPER

  • Special Attention

    NoSpecatt

  • Submitted date

    2012-04-11

  • Closed date

    2013-05-29

  • Last modified date

    2013-05-29

  • APAR is sysrouted FROM one or more of the following:

  • APAR is sysrouted TO one or more of the following:

Fix information

  • Fixed component name

    COG ADMINISTRAT

  • Fixed component ID

    5724W12AD

Applicable component levels

  • RA20 PSN

       UP

[{"Business Unit":{"code":"BU048","label":"IBM Software"},"Product":{"code":"SSEP7J","label":"Cognos Business Intelligence"},"Component":"","ARM Category":[],"Platform":[{"code":"PF025","label":"Platform Independent"}],"Version":"A11","Edition":"","Line of Business":{"code":"","label":""}}]

Document Information

Modified date:
06 March 2023