IBM Support

PM43736: RBD Rebuild issues with large projects

Subscribe

You can track all active APARs for this component.

 

APAR status

  • Closed as program error.

Error description

  • roblem description
    
    In a large workspace, after making minor changes to EGL parts:
    a)
    adding new method b) changing existing method; c) adding new
    
    RUIHandler, RBD triggers a massive re-build which can take in
    some
    cases hours. In addition, the rebuilds leave the workspace in
    unstable
    state, which forces us to do yet another clean rebuild of the
    entire
    workspace. This occurs with both RUI projects (deployed as
    JavaScript)
    and standard EGL projects (deployed as Java). In many cases, the
    
    changes are being confused as structural changes even though
    these
    changes should only be impacting the local methods or the parts.
    

Local fix

Problem summary

  • ****************************************************************
    * USERS AFFECTED:                                              *
    ****************************************************************
    * PROBLEM DESCRIPTION:                                         *
    ****************************************************************
    * RECOMMENDATION:                                              *
    ****************************************************************
    Parts that were not changed during a build were reporting
    that they had been changed, resulting in a larger build
    cycle than was necessary.
    

Problem conclusion

  • Changes have been made so that parts are only reported as
    changed at the appropriate times.
    

Temporary fix

Comments

APAR Information

  • APAR number

    PM43736

  • Reported component name

    RAT FUNC TESTER

  • Reported component ID

    5724G2503

  • Reported release

    801

  • Status

    CLOSED PER

  • PE

    NoPE

  • HIPER

    NoHIPER

  • Special Attention

    NoSpecatt

  • Submitted date

    2011-07-14

  • Closed date

    2012-01-27

  • Last modified date

    2012-01-27

  • APAR is sysrouted FROM one or more of the following:

  • APAR is sysrouted TO one or more of the following:

Fix information

  • Fixed component name

    RATL BUS DEV

  • Fixed component ID

    5724S5000

Applicable component levels

  • R801 PSN

       UP

[{"Business Unit":{"code":"BU058","label":"IBM Infrastructure w\/TPS"},"Product":{"code":"SSMQ79","label":"Rational Business Developer"},"Component":"","ARM Category":[],"Platform":[{"code":"PF025","label":"Platform Independent"}],"Version":"8.0.1","Edition":"","Line of Business":{"code":"LOB35","label":"Mainframe SW"}}]

Document Information

Modified date:
27 January 2012