IBM Support

PM41828: Report loses connection to tree prompt when leaving report inactive

Subscribe

You can track all active APARs for this component.

 

APAR status

  • Closed as program error.

Error description

  • This is related to Request:COGCQ00576137 (APAR PM32417)?Issue
    only occurs if Update 8.4.105.1065 is installed.??A report
    includes a tree prompt and a cross tab on report page. No
    activity is made for 60 minutes or more. Afterwards, when clicks
    '+' to expand tree prompt value, two logins are required. After
    log on successfuly (twice) it is possible to change the prompt
    value in the prompt. However, this change will not reflected
    within the report: The report still used the original prompt
    value.??In previous releases, the tree prompt "getPromptValues"
    was define with absolute affinity. With Update 8.4.105.1065 this
    has been changed to high affinity. The absolute affinity caused
    a dispatcher error, as soon the process was not longer available
    as described in Request:COGCQ00576137 (APAR PM32417).??Now,
    because of the high affinity, the request can be process by an
    other report service process. This avoids a dispatcher error.
    However, this causes new issues. When changing the prompt value
    it does not affect the report. This is already visible due to
    the two logins. Only one log on should be required, however it
    seems that tree prompt and report content are processed by
    different processes.
    

Local fix

Problem summary

  • ****************************************************************
    * USERS AFFECTED:                                              *
    * All Users                                                    *
    ****************************************************************
    * PROBLEM DESCRIPTION:                                         *
    * See error description.                                       *
    ****************************************************************
    * RECOMMENDATION:                                              *
    * Upgrade to IBM Cognos 8 Business Intelligence 8.4.1 Fix Pack *
    * 4                                                            *
    ****************************************************************
    

Problem conclusion

  • Code Fix
    

Temporary fix

Comments

APAR Information

  • APAR number

    PM41828

  • Reported component name

    COG8 BI COG CON

  • Reported component ID

    5724W12CC

  • Reported release

    841

  • Status

    CLOSED PER

  • PE

    NoPE

  • HIPER

    NoHIPER

  • Special Attention

    NoSpecatt

  • Submitted date

    2011-06-16

  • Closed date

    2011-12-16

  • Last modified date

    2011-12-16

  • APAR is sysrouted FROM one or more of the following:

  • APAR is sysrouted TO one or more of the following:

Fix information

  • Fixed component name

    COG8 BI COG CON

  • Fixed component ID

    5724W12CC

Applicable component levels

  • R841 PSN

       UP

[{"Business Unit":{"code":"BU048","label":"IBM Software"},"Product":{"code":"SSCHNWN","label":"Portal v11x"},"Component":"","ARM Category":[],"Platform":[{"code":"PF025","label":"Platform Independent"}],"Version":"841","Edition":"","Line of Business":{"code":"","label":""}}]

Document Information

Modified date:
16 December 2011