Fixes are available
APAR status
Closed as program error.
Error description
When a change is made to a requirement in IBM Rational DOORS, and then synchronized in IBM Rational Rhapsody, if the Rhapsody project is open, the changes are not visible in the diagram. Looking at the Features of the requirement show that either the actual requirement text or a ObjectShortText label from DOORS is not updated. This appears to be a Gateway issue. The only workaround is to save the project, then close it. Then on reopening the project, the name or the specification text should be updated.
Local fix
Problem summary
**************************************************************** * USERS AFFECTED: * **************************************************************** * PROBLEM DESCRIPTION: * **************************************************************** * RECOMMENDATION: * **************************************************************** Rhapsody 753 Not updating requirements specification in referenced project
Problem conclusion
Fixed in 7.5.3.2
Temporary fix
Comments
APAR Information
APAR number
PM40230
Reported component name
TLOGIC RHAPSODY
Reported component ID
5724V74RP
Reported release
751
Status
CLOSED PER
PE
NoPE
HIPER
NoHIPER
Special Attention
NoSpecatt
Submitted date
2011-05-26
Closed date
2011-09-22
Last modified date
2011-09-22
APAR is sysrouted FROM one or more of the following:
APAR is sysrouted TO one or more of the following:
Fix information
Fixed component name
TLOGIC RHAPSODY
Fixed component ID
5724V74RP
Applicable component levels
R751 PSN
UP
[{"Business Unit":{"code":"BU059","label":"IBM Software w\/o TPS"},"Product":{"code":"SS7P9W","label":"Rational Rhapsody"},"Platform":[{"code":"PF025","label":"Platform Independent"}],"Version":"7.5.1","Line of Business":{"code":"LOB59","label":"Sustainability Software"}}]
Document Information
Modified date:
27 October 2021