IBM Support

PM28910: QUERY STUDIO SHOWS INCORRECT RESULTS WHEN CREATING A CALCULATION BASED ON ANOTHER QUERY STUDIO CALCULATION

Subscribe

You can track all active APARs for this component.

 

APAR status

  • Closed as program error.

Error description

  • In Query Studio, when a calculation is created based on another
    query studio calculation, it is adding a total() to the already
    summarized calculation.?For example:?% Elapsed = Days
    Elapsed/Days of Event??Actual Trade Spend/% Elapsed = (Actual
    Trade Spend/Days Elapsed) * Days of Event??And?Estimated Trade
    Spend - (Actual Trade Spend/% Elapsed) = Estimated Trade Spend -
    ((Actual Trade Spend/Days Elapsed) * Days of Event)??Except in
    Query Studio?Estimated Trade Spend - (Actual Trade Spend/%
    Elapsed) = Estimated Trade Spend - Total(((Actual Trade
    Spend/Days Elapsed) * Days of Event)) ??Report Studio doesn't
    have this problem. If I create the same calculation in Report
    Studio using query items directly from the package like in Query
    Studio, it does not add total() function. Query Studio and
    Report Studio should be consistent.
    

Local fix

Problem summary

  • ****************************************************************
    * USERS AFFECTED:                                              *
    * All Users                                                    *
    ****************************************************************
    * PROBLEM DESCRIPTION:                                         *
    * See error description.                                       *
    ****************************************************************
    * RECOMMENDATION:                                              *
    * Upgrade to IBM Cognos 8 Business Intelligence 8.4.1 Fix Pack *
    * 2                                                            *
    * or Upgrade to IBM Cognos Business Intelligence 10.2 Refresh  *
    * Pack 1                                                       *
    ****************************************************************
    

Problem conclusion

  • Code Fix
    

Temporary fix

Comments

APAR Information

  • APAR number

    PM28910

  • Reported component name

    COG8 BI QUERY S

  • Reported component ID

    5724W12QS

  • Reported release

    841

  • Status

    CLOSED PER

  • PE

    NoPE

  • HIPER

    NoHIPER

  • Special Attention

    NoSpecatt

  • Submitted date

    2010-12-14

  • Closed date

    2013-04-26

  • Last modified date

    2013-06-11

  • APAR is sysrouted FROM one or more of the following:

  • APAR is sysrouted TO one or more of the following:

Fix information

  • Fixed component name

    COG8 BI QUERY S

  • Fixed component ID

    5724W12QS

Applicable component levels

  • R841 PSN

       UP

[{"Business Unit":{"code":"BU048","label":"IBM Software"},"Product":{"code":"SSCHNWV","label":"Query Studio v11x"},"Component":"","ARM Category":[],"Platform":[{"code":"PF025","label":"Platform Independent"}],"Version":"841","Edition":"","Line of Business":{"code":"","label":""}}]

Document Information

Modified date:
11 June 2013