IBM Support

PM09990: ABEND 906 when using Remote IMS debugger

A fix is available

Subscribe

You can track all active APARs for this component.

 

APAR status

  • Closed as program error.

Error description

  • After using the remote debugger for some time, an ABEND 906 is s
    een on the host.
    
    When debugging (with calls to z/OS), our stored procedure  DTC2S
    PES
    blocks after a while and there is no possibility to debug. Refre
    shing
    WLM-Environment of the stored proc DTC2SPES solves the problem f
    or a
    while.
    
    In the DTC2SPES we encounter following message:
    EF403I DTC2SPES - STARTED
    +DSNX991I  DSNX9WLM IMS ODBA INITIALIZATION COMPLETED
    CSV001I REQUESTS FOR MODULE ELARPIOP EXCEED MAXIMUM LOAD COUNT
    
    CSV028I ABEND906-04  JOBNAME=DTC2SPES  STEPNAME=IEFPROC
    

Local fix

Problem summary

  • ****************************************************************
    * USERS AFFECTED: USERS OF RATIONAL COBOL RUNTIME FOR ZSERIES  *
    ****************************************************************
    * PROBLEM DESCRIPTION: ABEND 906 WHEN USING REMOTE IMS         *
    *                      DEBUGGER                                *
    ****************************************************************
    * RECOMMENDATION: APPLY THIS MAINTENANCE                       *
    ****************************************************************
    ABEND 906 WHEN USING REMOTE IMS DEBUGGER
    

Problem conclusion

  • ABEND 906 WHEN USING REMOTE IMS DEBUGGER
    

Temporary fix

Comments

APAR Information

  • APAR number

    PM09990

  • Reported component name

    RATL COBOL RT Z

  • Reported component ID

    5655R2900

  • Reported release

    601

  • Status

    CLOSED PER

  • PE

    NoPE

  • HIPER

    NoHIPER

  • Special Attention

    NoSpecatt

  • Submitted date

    2010-03-15

  • Closed date

    2010-09-17

  • Last modified date

    2010-11-02

  • APAR is sysrouted FROM one or more of the following:

    PM09989

  • APAR is sysrouted TO one or more of the following:

Modules/Macros

  • ELARSTRM
    

Fix information

  • Fixed component name

    RATL COBOL RT Z

  • Fixed component ID

    5655R2900

Applicable component levels

  • R601 PSY UK60551

       UP10/10/07 P F010

Fix is available

  • Select the PTF appropriate for your component level. You will be required to sign in. Distribution on physical media is not available in all countries.

[{"Business Unit":{"code":"BU058","label":"IBM Infrastructure w\/TPS"},"Product":{"code":"SSN27B","label":"Rational COBOL Runtime for zSeries"},"Component":"","ARM Category":[],"Platform":[{"code":"PF025","label":"Platform Independent"}],"Version":"6.0.1","Edition":"","Line of Business":{"code":"LOB35","label":"Mainframe SW"}},{"Business Unit":{"code":"BU054","label":"Systems w\/TPS"},"Product":{"code":"SG19M","label":"APARs - z\/OS environment"},"Component":"","ARM Category":[],"Platform":[{"code":"PF025","label":"Platform Independent"}],"Version":"6.0.1","Edition":"","Line of Business":{"code":"","label":""}}]

Document Information

Modified date:
02 November 2010