APAR status
Closed as program error.
Error description
If you are operating within a project list (i.e. multiple projects are open in a single instance of Rhapsody), then upon checking in a unit, the unit will NOT automatically be saved, and if you have not manually saved the unit, then you will lose all of the changes since the last save upon completion of the checkin operation. This occurs with both projects in the list. The problem has been consistently reproduced by creating a project list, closing it and then reopening it, making changes and then attempting to check in those changes without saving. The client is using Razor 5.2 as their CM tool with Rhapsody 7.4.0. Support was able to reproduce this problem using Clearcase 7.0. The only workaround to it is manually saving the work before attempting to check in the changes. Quintus # 224581
Local fix
To save the work before attempting to check in.
Problem summary
Save using Project Lists is failing during check in***PMR 12606999000*****PK86476
Problem conclusion
Fixed in 7.5.1
Temporary fix
Comments
APAR Information
APAR number
PK86476
Reported component name
TLOGIC RHAPSODY
Reported component ID
5724V74RP
Reported release
740
Status
CLOSED PER
PE
NoPE
HIPER
NoHIPER
Special Attention
NoSpecatt
Submitted date
2009-05-13
Closed date
2009-12-03
Last modified date
2009-12-03
APAR is sysrouted FROM one or more of the following:
APAR is sysrouted TO one or more of the following:
Fix information
Fixed component name
TLOGIC RHAPSODY
Fixed component ID
5724V74RP
Applicable component levels
R740 PSN
UP
[{"Business Unit":{"code":"BU059","label":"IBM Software w\/o TPS"},"Product":{"code":"SS7P9W","label":"Rational Rhapsody"},"Component":"","ARM Category":[],"Platform":[{"code":"PF025","label":"Platform Independent"}],"Version":"7.4","Edition":"","Line of Business":{"code":"LOB59","label":"Sustainability Software"}}]
Document Information
Modified date:
03 December 2009