APAR status
Closed as program error.
Error description
Quintus ID: 224429 Description: The menu option 'Layout -? Complete relations' does not show the satisfaction links present between an activity parameter (as source) and a requirement (as destination). Steps to Reproduce: 1] Open a Rhapsody SysML Project. 2] Create an Activity Diagram. 3] Create an Activity parameter in the AD. 4] Create a Requirement in the browser and then drag and drop it into the AD. 5] Now click on the Activity parameter in the browser and select Add New-?Requirements-?Satisfaction 6] Select the created Requirement in that package. 7] Save the project. 8] Now Click on Layout-?Complete Relations-?All 9] The Satisfy link does not appear.
Local fix
Draw the Satisfy Dependency manually between the Activity parameter and the Requirement.
Problem summary
[APAR Number: PK86204] Complete relations does not show the satisfy link
Problem conclusion
Fixed in 7.5.1
Temporary fix
Comments
APAR Information
APAR number
PK86204
Reported component name
TLOGIC RHAPSODY
Reported component ID
5724V74RP
Reported release
740
Status
CLOSED PER
PE
NoPE
HIPER
NoHIPER
Special Attention
NoSpecatt
Submitted date
2009-05-08
Closed date
2009-12-02
Last modified date
2009-12-02
APAR is sysrouted FROM one or more of the following:
APAR is sysrouted TO one or more of the following:
Fix information
Fixed component name
TLOGIC RHAPSODY
Fixed component ID
5724V74RP
Applicable component levels
R740 PSN
UP
[{"Business Unit":{"code":"BU059","label":"IBM Software w\/o TPS"},"Product":{"code":"SS7P9W","label":"Rational Rhapsody"},"Component":"","ARM Category":[],"Platform":[{"code":"PF025","label":"Platform Independent"}],"Version":"7.4","Edition":"","Line of Business":{"code":"LOB59","label":"Sustainability Software"}}]
Document Information
Modified date:
02 December 2009